Skip to product information
1 of 19

UCHANGE Promo

Aqueduct-VI 30 Oz. Tumbler Mugs with Straw (Double Walled)

Aqueduct-VI 30 Oz. Tumbler Mugs with Straw (Double Walled)

Regular price $13.75 USD
Regular price Sale price $13.75 USD
Sale Sold out

Item #UPRE784

Quantity

Double-walled insulation meets premium design in this upscale tumbler. This 30-ounce stainless steel tumbler keeps drinks at the perfect temperature for hours. Laser engraving, full-color digital, or screen printing creates lasting brand impressions. Free proof before you pay. MOQ is just 25 units. Seven-day lead time. Includes matching straw. Executive clients love this investment.

Specifications

Material Stainless Steel
Production Time 7 business days
Packaging Gift Boxes, Poly Bag

Volume Pricing

Quantity Price Per Unit Savings
25+ units $13.75
150+ units $13.4 3% OFF
300+ units $13.1 5% OFF
600+ units $12.9 6% OFF
1200+ units $12.75 7% OFF

Contact us for custom quotes on larger orders.

Frequently Asked Questions

What's the MOQ on this premium tumbler?
Just 25 units. Lowest MOQ we offer—great for executive gifting or small-batch launches.

Which decoration techniques are available?
Laser engraving, full-color digital, and screen printing. Laser engraving adds lasting premium appeal.

How long is production?
7 business days. Includes quality assurance on all double-walled construction.

Minimum order25 units
Production lead time~7 business days
Decoration methodsLaser Engraving, Full-Color Digital, Screen Printing
Color optionsLight Blue, White, Black, Pink, Blue, Light Green, Light Pink, Orange, Silver
MaterialStainless Steel
~17-min average first replyFree digital proof before you payMake-it-right guaranteeU.S.-based supplier

Frequently asked questions

What's the MOQ on this premium tumbler?
Just 25 units. Lowest MOQ we offer—great for executive gifting or small-batch launches.
Which decoration techniques are available?
Laser engraving, full-color digital, and screen printing. Laser engraving adds lasting premium appeal.
How long is production?
7 business days. Includes quality assurance on all double-walled construction.
View full details