Skip to product information
1 of 4

UCHANGE Promo

24 Can PVC Leak Proof Insulated Shoulder Cooler Bag

24 Can PVC Leak Proof Insulated Shoulder Cooler Bag

Regular price $19.93 USD
Regular price Sale price $19.93 USD
Sale Sold out

Item #UPXD964

Quantity

Holds 24 cans of cold beverages—ideal for outdoor events and client entertainment. This insulated shoulder cooler combines premium leak-proof construction with practical carrying design. Oxford material ensures durability in heavy use. Large capacity perfect for extended events. Screen printing branding. Answer in about 17 minutes for a production quote and timeline.

Specifications

Material Oxford
Dimensions 18 x 10 x 13.5 in
Weight 1.98 lb
Production Time 15 business days
Packaging Individual Poly Bag

Volume Pricing

Quantity Price Per Unit Savings
500+ units $19.933
1000+ units $18.483 7% OFF
3000+ units $17.9 10% OFF
5000+ units $17.2 14% OFF
10000+ units $16.717 16% OFF
30000+ units $15.883 20% OFF

Contact us for custom quotes on larger orders.

Frequently Asked Questions

What's the minimum order?
500 units minimum. Large MOQ reflects premium manufacturing and material sourcing.

What decoration methods are available?
Screen printing on exterior panels for durable, weather-resistant logos. Multiple placement options available—front, back, or side.

What's the production timeline?
15 days from proof approval. Timeline includes material procurement, assembly, and leak-proof testing.

Minimum order500 units
Production lead time~15 business days
Decoration methodsScreen Printing
Imprint area3.0 x 2.0 in
Color optionsAny/All Colors, White, Black, Blue
MaterialOxford
~17-min average first replyFree digital proof before you payMake-it-right guaranteeU.S.-based supplier

Frequently asked questions

What's the minimum order?
500 units minimum. Large MOQ reflects premium manufacturing and material sourcing.
What decoration methods are available?
Screen printing on exterior panels for durable, weather-resistant logos. Multiple placement options available—front, back, or side.
What's the production timeline?
15 days from proof approval. Timeline includes material procurement, assembly, and leak-proof testing.
View full details