1
/
of
6
UCHANGE Promo
14oz Stainless Steel Insulated Beer Bottle Holder Can Cooler
14oz Stainless Steel Insulated Beer Bottle Holder Can Cooler
Regular price
$11.56 USD
Regular price
Sale price
$11.56 USD
Item #UPRP182
Quantity
Couldn't load pickup availability
Insulated beer bottle holder keeps drinks at the perfect temperature. Double-wall stainless steel design fits 14oz cans and bottles snugly. Thirteen colors to match your brand identity. Screen printing, laser engraving, and full-color digital decoration all available. We answer questions in about 17 minutes.
Specifications
| Material | Stainless Steel |
| Dimensions | 2.7 x 3 x 6.3 in |
| Weight | 0.77 lb |
| Production Time | 7 business days |
| Packaging | Gift Bag |
Volume Pricing
| Quantity | Price Per Unit | Savings |
|---|---|---|
| 50+ units | $11.562 | — |
| 100+ units | $10.818 | 6% OFF |
| 300+ units | $6.748 | 42% OFF |
| 500+ units | $6.175 | 47% OFF |
| 800+ units | $5.642 | 51% OFF |
| 1000+ units | $5.135 | 56% OFF |
| 3000+ units | $4.752 | 59% OFF |
| 5000+ units | $4.407 | 62% OFF |
Contact us for custom quotes on larger orders.
Frequently Asked Questions
Minimum order size?
50 units. Standard for corporate giveaways and promotional campaigns.
What printing options work?
Screen printing, laser engraving, and full-color digital. Choose based on logo complexity and finishing preference.
Production timeline?
7 days from approved proof. Fast enough for upcoming events.
Minimum order50 units
Production lead time~7 business days
Decoration methodsScreen Printing, Laser Engraving, Full-Color Digital
Color optionsWhite, Black, Blue, Pink, Green, Navy Blue, Yellow, Brown, Gray, Orange, Red, Purple, Custom
MaterialStainless Steel
~17-min average first replyFree digital proof before you payMake-it-right guaranteeU.S.-based supplier
Frequently asked questions
Minimum order size?
50 units. Standard for corporate giveaways and promotional campaigns.
What printing options work?
Screen printing, laser engraving, and full-color digital. Choose based on logo complexity and finishing preference.
Production timeline?
7 days from approved proof. Fast enough for upcoming events.
Share
